Skip to main content
Skip table of contents

PROJECTBEGINNINGQUANTITY function

Applies to:

  • PM Module
  • Acumatica, MYOB Acumatica, Cegid XRP Flex


Description


The PROJECTBEGINNINGQUANTITY function calculates (for a specific financial period) the beginning quantity of one or more project(s) and task(s) containing Inventory Item information.

Syntax

PROJECTBEGINNINGQUANTITY(Connection, Project, Task, AccountGroup, CostCode, InventoryItem, AsOfPeriod, Branch, UseMasterFinancialCalendar)

Parameters

The PROJECTBEGINNINGQUANTITY function has the following parameters (See our article on Filtering Velixo functions).

Parameter

Required/Optional

Description

Connection

Required

Name of the connection as configured in the connection manager

Project

Required

The Project(s) to include

Task

Optional

The Task(s) to include

AccountGroup

Optional

The Account Group(s) to include

CostCode

Optional

The Code Code(s) to include

InventoryItem

Optional

The Inventory Item(s) to include

AsOfPeriod

Required

Financial period in the format MM-YYYY

Branch

Optional

The Branch(es) to include

Requires Acumatica or MYOB Acumatica 2019 or later; in earlier versions, this parameter must be left blank

UseMasterFinancial CalendarOptional

Use Acumatica's Master Financial Calendar instead of the financial calendar defined within the specific tenant associated with the connection being accessed (this can be useful for consolidation reports).


Possible values:

  • True
  • False (default)

Example

=PROJECTBEGINNINGQUANTITY("Demo", "TMR03", , "LABOR",, ,"01-2017")

Description:

Calculates the number of hours of Labor for project TMR03 as of the start of January 2017.

Result

240

The results of the PROJECTBEGINNINGQUANTITY function intentionally exclude data from project transactions which do not include an InventoryID.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.