Skip to main content
Skip table of contents

PROJECTBEGINNINGAMOUNT function

Applies to

  • Velixo NX
  • Velixo Classic
  • PM Module
  • Acumatica, MYOB Acumatica, Cegid


Description

The PROJECTBEGINNINGAMOUNT function calculates the beginning amount of one or more project(s) and task(s) as of a specific period.

Syntax

PROJECTBEGINNINGAMOUNT(Connection, Project, Task, AccountGroup, CostCode,  InventoryItem, AsOfPeriod, Branch, UseProjectCurrency, UseMasterFinancialCalendar)


Parameters


The PROJECTBEGINNINGAMOUNT function uses the following parameters (see our article on Filtering Velixo functions):

Parameter

Required/Optional

Description

Connection

Required

The name of the connection as configured in the Connection Manager

Project

Required

The Project(s) to include

Task

Optional

The Task(s) to include

AccountGroup

Optional

The Account Group(s) to include

CostCode

Optional

The Cost Code(s) to include

InventoryItem

Optional

The Inventory Item(s) to include

AsOfPeriod

Required

The financial period in MM-YYYY format

Branch

Optional

The Branch(es) in include.

Requires Acumatica or MYOB Acumatica 2019 or later; in earlier versions, this parameter must be left blank.

UseProjectCurrency

Optional

TRUE/FALSE value indicating if the amount should be returned in the project's currency (default = FALSE)

UseMasterFinancial CalendarOptional

Use Acumatica's Master Financial Calendar instead of the financial calendar defined within the specific tenant associated with the connection being accessed (this can be useful for consolidation reports).


Possible values:

  • True
  • False (default)

Example

=PROJECTBEGINNINGAMOUNT("Demo", "TMR03", , "LABOR",,, "12-2018",
FALSE)

Description

Calculates the beginning cost of labor for project TMR03 as of the start of December 2018 and returns the value in the default currency.

Result

17040


JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.