SI.PROJECTESTIMATEQUANTITY
Overview
The SI.PROJECTESTIMATEQUANTITY returns the quantity set for one or more estimates configured for a specified project/projects, optionally filtered by Task ID, CostType ID, and/or Item ID.
Syntax
=SI.PROJECTESTIMATEQUANTITY(Connection, Project, EstimateId, TaskId, CostTypeId, ItemId, WorkflowType, IncludeChildDimensionBalances)
Arguments
The SI.PROJECTESTIMATEQUANTITY function uses the following arguments (please see the article on Filtering Techniques for Velixo Functions for how to include multiple values in an argument):
Argument | Required/Optional | Description |
| Required | The name of the connection as configured in the Connection Manager |
| Required | The ID of one or more projects containing the estimate wanted |
| Optional | The ID of one or more estimates for which the quantity value is wanted. (If left empty value, the Primary estimate is used.) |
| Optional | The ID of one or more tasks to be used to filter the results (If left empty value, estimates for all tasks will be included) |
| Optional | The ID of one or more Cost Types to be used to filter the results (If left empty value, estimates for all Cost Types will be included) |
| Optional | The ID of one or more Items to be used to filter the results (If left empty value, estimates for all Items will be included) |
| Optional | The workflow types to be included in the results.
|
| Optional |
![]() |
Examples
Example 1 - filtered by project (job) and a single task
=SI.PROJECTESTIMATEQUANTITY("Sage", "20-005",,"G01-040")
Description
Returns quantity for primary estimate for task number G01-040 in project 20-005
Result

(cell references have been used for some arguments in this example)
Example 2 - filtered by estimate, project, and multiple tasks
=SI.PROJECTESTIMATEQUANTITY("Sage", "20-005","100",C5#)
Description
Returns the quantity for estimate 100 for all tasks displayed by the function in cell C5 for project 20-005
Result